All work necessary for assembling and instalation of the brewery (or the cider production line).
They include:
- Electrical work – installation of power and signal wires
- Programmers – programming of the control system for the brewery
- Installation of the steam-generators + briefing
- Revision of electrical equipment
- Revision of pressure equipment – piping
- Installation of the brewery – installation of technology on site
- Installation of dispense equipment
- Connection to the brewery taproom
Usual assembling plan :
- Number of workers 3 workers
- Estimated installation work days 15 days
- Daily working time 12 Hour per day