XAIW-16000 Assembling and instalation work

 16000 excluding tax

All work necessary for assembling and instalation of the brewery (or the cider production line).

They include:
  • Electrical work – installation of power and signal wires
  • Programmers – programming of the control system for the brewery
  • Installation of the steam-generators + briefing
  • Revision of electrical equipment
  • Revision of pressure equipment – piping
  • Installation of the brewery – installation of technology on site
  • Installation of dispense equipment
  • Connection to the brewery taproom
Usual assembling plan :
  • Number of workers 3 workers
  • Estimated installation work days 10 days
  • Daily working time 12 Hour per day
SKU: XAIW-16000 Category:

Description

Print Friendly, PDF & Email

All work necessary for assembling and instalation of the brewery (or the cider production line).

 

They include:
  • Electrical work – installation of power and signal wires
  • Programmers – programming of the control system for the brewery
  • Installation of the steam-generators + briefing
  • Revision of electrical equipment
  • Revision of pressure equipment – piping
  • Installation of the brewery – installation of technology on site
  • Installation of dispense equipment
  • Connection to the brewery taproom

 

Usual assembling plan :
  • Number of workers 3 workers
  • Estimated installation work days 8 days
  • Daily working time 12 Hour per day

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.